BUILDING SERVICES - HOSPITALS AND HEALTHCARE

Project

Brierley Hill Medical Centre, West Midlands

Client

Dudley South Primary Care Trust and Infracare

Architect/Consulting Engineer

Steffian Bradley Associates

Contractor

Carillion Planned Maintenance

Distributor

Pipe Centre (Nottingham)

Specification

Crane Fluid Systems - ProBalance balancing valves


Construction of the 11,000 sq m Brierley Hill Medical Centre, which will provide 21st century healthcare facilities for Dudley Primary Care Trust, has begun. Installed with a low energy M&E package, half the building will be naturally ventilated and the other half will rely on traditional HVAC systems. Over 1,200 Crane ProBalance valves will control the heating and chilled water flow through fan coil units within the 5 storey building.

Crane's ProBalance bronze balancing valves use fixed orifice technology to ensure fast commissioning and enhanced regulating performance. The compact design means they take up less space and the integral orifice reduces the need for on-site jointing, resulting in reduced installation costs for the contractor.