The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
This prestigious project utilised a range of Crane FS butterfly, ball and balancing valves for chilled water applications
Balancing valves for a 21km, underground, automatic, driverless metro in Singapore
Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
High rise – primarily residential building with some floors designated for business use.
The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.
A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.
A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.
The largest tertiary hospital in UAE – built as part of the Abu Dhabi Economic Vision 2030.
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.