One of the HVAC plant rooms at the complex serving 75 international & local companies.
A range of valves for a cutting edge hospital in Qatar
A modern mixed-use project, using Crane FS’ Dominator Peak Pro
Supplying 300 Peak Pro Dominators to London’s oldest hospital
Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.
A 300-kilometre metro network with four lines and 80 stations;
295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.
A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.