<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
st-barts-london

St Barts Hospital, London

Project Overview

Location

London, UK

Consultant

STW Architects

Main Contractor

Kier

Client

Nuffield Health

Channel Partner

Wolseley Bristol

M&E Contractor

Integral

Specification

Crane FS Peak Pro Dominators
Download case study as PDF

Crane Fluid Systems is supplying 300 Peak Pro Dominators to London’s oldest hospital, St Bartholomew’s in the City of London, which is undergoing an extensive modernization of the existing pathology unit and residential staff quarters, to provide a new private hospital for Nuffield Health.

The main contractor is Kier, and Crane FS is working in close partnership with Integral a UK M&E specialist service provider supplying 40mm Dominators for direct connection to fan coil units (FCUs) and 80mm Z9601PF Dominator’s for other terminal units, including chilled beams.These units come complete with integrated PICV and actuator, strainer, flow measurement device and flushing drains. All the valves are pressure tested in accordance with BS EN 12266-1 as well as having a flow limitation test meeting BSRIA standards as per BTS 01.

The final fully assembled manifolds are manufactured in the UK and each one is individually factory tested to ensure the unit meets specification and ensures reduced installation times on site. The 40mm Dominators are being assembled into FCUs by Quartz, with Crane FS working closely alongside Integral to ensure that the proposed units meet the requirements from the designer and provide the greatest energy efficiency and shortest commissioning times possible.

The new £60M facility is scheduled to open in the Spring of 2021 and will have 48 bedrooms, 4 state of the art operating theatres and 28 consultation rooms and will specialize in cardiology, cardiac surgery, oncology, and orthopaedics. The building will also provide physiotherapy and diagnostics, as well as in patient and out-patient services.

Published: 2020
Related Projects
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
cleveland-clinic
Medical
Cleveland Clinic, Abu Dhabi

The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.

DownloadRead Case Study
picadilly-gate
Public Sector
Piccadilly Gate

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

Read Case Study
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study