Crane Fluid Systems has supplied a comprehensive range of general valves to the Global Switch Data Centre at East India Dock, London – supporting the reliable operation and long-term maintenance of this critical digital infrastructure.
Located in London’s Docklands and spanning approximately 450,000 sq ft of technical space, Global Switch London East is one of the UK’s most established carrier-neutral data centres. Serving cloud, enterprise and financial services customers, the facility demands the highest levels of operational resilience. The campus is now being upgraded to support higher-density workloads associated with AI, HPC (High Performance Computing) and next-generation cloud infrastructure, making reliable flow control and isolation solutions essential to maintaining continuous service.
Crane Fluid Systems’ valve solutions have been selected not only for their durability and precision, but for their ability to support efficient servicing and minimise disruption during maintenance cycles.
Designed to provide accurate flow control and dependable isolation, the valves enable straightforward access for inspection, adjustment, and replacement, helping operators maintain optimal system conditions without unnecessary downtime.
By supporting both day-to-day system performance and long-term serviceability, Crane Fluid Systems’ solutions contribute to improved operational efficiency and reduced lifecycle costs. This project reinforces the company’s commitment to delivering reliable solutions tailored to the evolving needs of the data centre sector.

Related Projects
Claimed to be the largest mall in the world – opening with more than 1200 stores.
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.
Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment
The facility includes 1200 student rooms and a 32 bed hotel.