<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®

Our Solutions

Steigenberger Hotel Cairo
Hotels & Leisure

Steigenberger Hotel, Cairo

295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

Download Read Case Study
DSC01481s
Commercial

Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
HanoverSquare4
Mixed Development

Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
beirut
Medical

Clemenceau Medical Center CMC, Beirut

The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.

Download Read Case Study
beirut
Leisure

ABC Verdun, Beirut

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

Download Read Case Study
crane2137
Commercial

Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

Download Read Case Study
british-museum
Arts

British Museum

Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.

Read Case Study
skinners
Education

The Skinner’s Kent Academy

Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.

Read Case Study
5-broadgate
Financial

5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
picadilly-gate
Public Sector

Piccadilly Gate

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

Read Case Study
great-blakenham
Infrastructure

Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
spring-mews
Education

Spring Mews Student Accommodation

Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.

Read Case Study