Our genius is valves ®
DSC01481s

Chaplin House

Project Overview

Location

London, UK

Contractor

Delta T Services

Specification

Dominator Peak Pro 

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

The self-contained office building has undergone comprehensive refurbishments to a Grade A office specification.

Lightweight and modular, the Dominator Peak valve system includes the Peak Pro Pressure Independent Control Valve for accurate flow, temperature and pressure control. The compact units have an integral Venturi metering station for an improved flow range, a small footprint with equal length pipework and the ability to orientate the valve on-site for an easier and faster installation on any fan coil or chilled beam.

The system is able to achieve excellent valve authority at all settings by utilising the Crane FS gap detection actuator. This allows for maximum efficiency gains against required pump settings to achieve the required flow rates.

The Dominator Peak Pro has been designed to deliver and maintain a system that enables energy and cost reduction over its lifetime. Prior to production, the valve has undergone significant design validation testing in accordance with BSRIA BTS01, subjected to 10,000 cycles, which is equivalent to 15 years of typical service, and the performance has remained excellent. In addition, every Peak Pro PICV is tested to in accordance with BSRIA BTS-01, more specifically a Flow Limitation test (FLT).

DSC01770s
Related Projects
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
aldersgate-manchester
Mixed Development
Aldersgate Street, London

Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.

DownloadRead Case Study