The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.
Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.
Related Projects
The facility includes 1200 student rooms and a 32 bed hotel.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire