The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.
Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.
Related Projects
Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
The facility includes 1200 student rooms and a 32 bed hotel.