Opened by the Minister for Trade and Industry in 2013, Ocean Towers, Shanghai, was built at a total cost of USD 110 million. A 25-storey grade A intelligent building, equipped with state-of-the-art office, with over 48,000 sq m of lettable floor space. The building also comprises a ground floor retail area and three floors of underground parking facilities. 

Various Crane Fluid Systems commissioning valves were used in the build, chosen for their quality, space and weight-saving qualities. Ocean Towers is strategically located in Shanghai’s prime commercial district of Huang Pu, and situated at the exit tunnel linking the central business districts of Puxi and Pudong.

Related Projects
serafi-mall
Mixed Development
Serafi Mall, Jeddah

A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.

DownloadRead Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
hsbc-skyline
Financial
HSBC Data Centre

This HSBC Data Centre is the first standalone data centre in Hong Kong meeting the design requirements of Tier IV standard.

Read Case Study