<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Bosch HQ

A wide range of Crane Fluid Systems valves have been specified for phase 2 upgrades of the Worcester Bosch facility in Worcester.

M&E consultants ESDP were required to undertake the project using Revit and BIM compliant products.

Not only were Crane Fluid Systems the specified valve manufacturer for the project, their extensive range of revit models available via the Bimstore means they have secured these parts aswell as planned future phases.

The schematic below is an example of Crane FS valves being used on this project based on the specification and their use within the BIM model. A 3D model is created using BIM components and then this is converted to a 2D schematic showing the valve outlines. 

Bim schematic

Click here to find out more about Cranes Fluid Systems BIM components. 

Latest News
Data Centre World Frankfurt
Crane Fluid Systems Will Be At Data Centre World Frankfurt

Join the the team on Stand H126 at Messe Frankfurt, where we’ll be showcasing how our engineered valve solutions support resilient, efficient and high-performance data centre environments.

22 Apr 2026
Data Centre World 2026
Crane Fluid Systems at Data Centre World London

We had a great couple of days at the show, part of Tech Show London, on the 4 and 5 March 2026.

06 Mar 2026
CPD session with Crane Fluid Systems
Crane Fluid Systems Powers Industry Learning with 100+ CPDs in 2025

Crane Fluid Systems has completed 107 Continuing Professional Development (CPD) sessions during 2025.

26 Feb 2026