<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Bosch HQ

A wide range of Crane Fluid Systems valves have been specified for phase 2 upgrades of the Worcester Bosch facility in Worcester.

M&E consultants ESDP were required to undertake the project using Revit and BIM compliant products.

Not only were Crane Fluid Systems the specified valve manufacturer for the project, their extensive range of revit models available via the Bimstore means they have secured these parts aswell as planned future phases.

The schematic below is an example of Crane FS valves being used on this project based on the specification and their use within the BIM model. A 3D model is created using BIM components and then this is converted to a 2D schematic showing the valve outlines. 

Bim schematic

Click here to find out more about Cranes Fluid Systems BIM components. 

Latest News
200 Gray Inn
Crane Fluid Systems Supplies 200 Gray’s Inn Road

Supplied via our trusted channel partner Ashworth, our valves will play a key role in supporting the building’s HVAC infrastructure

22 May 2026
220 Blackfriars, London
Dominator Eco Valves for 220 Blackfriars

We have supplied a significant order of Dominator Eco valves to be utilised in the 220 Blackfriars development in London.

22 May 2026
Crane Fluid Sysyems at Data Centre World Frankfurt 2026
Data Centre World Frankfurt 2026

Thank you to everyone who visited Crane Fluid Systems at Tech Show Frankfurt Data Centre World.

11 May 2026