Crane FS Project Valves, including ball, butterfly, check and strainers were supplied via BSS for installation within the energy centre, which supplies heated water throughout the development at King’s Cross, London.
The 67-acre mixed use development includes 2,000 new homes, new offices and retail space, 20 new streets and 10 public spaces, creating an entirely new piece of the city with its own postcode.
Crane FS valves will be installed in a site-wide Combined Heat and Power (CHP) driven hot water distribution network fed from a central energy centre. This is just one of the methods used on this site to cut energy consumption. Others include energy efficient buildings achieving a minimum BREAAM of ‘Excellent’ roof-mounted wind turbines, ground source heat pumps and rainwater harvesting.
The first buildings have been inhabited since autumn 2012.
Related Projects
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
Balancing valves for a 21km, underground, automatic, driverless metro in Singapore
Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.