Completion of the HVAC system in one of the UK’s newest hospitals, Broomfield Hospital in Chelmsford, is due for July 2010. It will be capable of carrying out up to 20,000 treatments a year. It will comprise 361 beds, 5 theatres, a 100-bed emergency assessment facility, a new A&E department, a pharmacy suite, a maternity & neonatal care unit and a rooftop helipad for the Essex Air Ambulance service.
Crane Fluid Systems valves are being installed to control flow in the heating and cooling water systems throughout the hospital. Their adaptability to modular construction and installation enables commissioning and maintenance work to be carried out with minimum disruption.
Related Projects
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.
Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.