<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Brierley

Brierley Hill Medical Centre

Project Overview

Project

Brierley Hill Medical Centre

Client

Dudley South Primary Care Trust and Infracare

Architect/Consulting Engineer

Steffian Bradley Associates

Contractor

Carillion Planned Maintenance

Distributor

Pipe Centre (Nottingham)

Specification

Crane FS ProBalance Balancing Valves
Download case study as PDF

The 11,000sq m Brierley Hill Medical Centre provides 21st Century healthcare facilities for Dudley Primary Care Trust. Installed with a low energy M&E package, half of the building will be naturally ventilated and the other half will rely on traditional HVAC systems.

Over 1,200 Crane ProBalance valves control the heating and chilled water flow through fan coil units within the 5 storey building. Crane’s ProBalance bronze balancing valves use fixed orifice technology to ensure fast commissioning and enhanced regulating performance. The compact design means they take up less space and the integral orifice reduces the need for on-site jointing, resulting in reduced installation costs for the contractor.

Related Projects
Crossrail
Retail
Crossrail Shopping Centre

Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.

Read Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
first-street
Arts
First Street Cultural Centre

Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

Read Case Study