<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Manchester-Airport

Manchester Airport

Project Overview

Location

Manchester, United Kingdom

Sector

Infrastructure

M&E Contractor

Rotary North West
Download case study as PDF

The heating and air-conditioning systems within the Ground Transport Interchange at Manchester Airport are controlled by the latest fan coil management system from Crane Fluid Systems.

Specification

Z3000 Dominator valves

Manchester AIrport
Related Projects
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
seashell-trust
Mixed Development
Seashell Trust, Manchester

An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.

DownloadRead Case Study
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
aldersgate-manchester
Mixed Development
Aldersgate Street, London

Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.

DownloadRead Case Study
University of Birmingham
Education
Molecular Sciences Building, University of Birmingham

Crane Fluid Systems have supplied DPZV valves for the construction of the new Molecular Sciences building at University of Birmingham.

Read Case Study