Our genius is valves ®
Manchester-Airport

Manchester Airport

Project Overview

Location

Manchester, United Kingdom

Sector

Infrastructure

M&E Contractor

Rotary North West
Download case study as PDF

The heating and air-conditioning systems within the Ground Transport Interchange at Manchester Airport are controlled by the latest fan coil management system from Crane Fluid Systems.

Specification

Z3000 Dominator valves

Manchester AIrport
Related Projects
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
Qatar-Rail
Infrastructure
Qatar National Rail Scheme

A 300-kilometre metro network with four lines and 80 stations;

DownloadRead Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study
first-street
Arts
First Street Cultural Centre

Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

Read Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study