Sheldon Square

Sheldon Square, London

Project Overview

Project

3 Sheldon Square, Paddington, London

MEP Contractor

MSL

Products Used

Dominator Eco

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

The refurbishment of the 11-storey office building will provide sustainable, high-quality workspaces with a focus on occupant well-being. Building owner British Land are challenging the conventions of corporate workplace design by establishing a connection to nature through a series of cascading hanging balconies.

Selected in line with the project’s sustainability strategy, the Dominator Eco has been engineered with sustainability in mind, delivering accurate flow, temperature, and pressure control to aid HVAC system efficiency.

Furthermore, embodied carbon has been reduced with a 28% shorter and 36% lighter design that is delivered in eco-friendly packaging with a digital installation guide to further minimise the product’s impact on the planet.

Crane BS&U officially launched the Dominator Eco at an event in central London in April this year. Held at the Wellcome Collection, Euston, the event showcased the new Dominator Eco and provided valuable insight into variable volume solutions and sustainability to an audience of building services contractors and consultants.

Dominator Eco

Dominator Eco installated at Sheldon Place, Paddington

Sheldon Square

Related Projects
akh-tower
Commercial
AKH Tower, Dammam

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

DownloadRead Case Study
spring-mews
Education
Spring Mews Student Accommodation

Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.

Read Case Study
seashell-trust
Mixed Development
Seashell Trust, Manchester

An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.

DownloadRead Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study