<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
tower-wharf-bristol

Tower Wharf, Bristol

Project Overview

Location

Bristol, United Kingdom

Sector

Mixed Development

M&E Contractor

Haden Young
Download case study as PDF

Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.

Specification

Crane FS isolation and balancing valves.

 

Related Projects
DPZVs in Thames Valley Police F Block
Public Sector
Thames Valley Police F Block Project

Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire

DownloadRead Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
skinners
Education
The Skinner’s Kent Academy

Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.

Read Case Study