<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
akh-tower

AKH Tower, Dammam

Project Overview

Location

Dammam, Saudi Arabia

Sector

Mixed Development

Client

Abdulkarim Tower

M&E Consultant

Dewan Architects

M&E Contractor

Shapoorji Pallonji, Olayan Voltas - Saudi Ensas

Distributor

ARCOM
Download case study as PDF

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

Specification

Crane FS HVAC valves

Related Projects
fountain-views
Residential
Fountain Views Hotel & Residence, UAE

A high-rise complex that comprises luxury serviced apartments as well as an ‘Address’ branded hotel.

DownloadRead Case Study
lusail-stadium
Leisure
Lusail Stadium, Qatar

An imposing 80,000 seater stadium that will host the 2022 World Cup final.

DownloadRead Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
cleveland-clinic
Medical
Cleveland Clinic, Abu Dhabi

The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study