<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
arsenal-emirates

Arsenal Emirates Stadium

Project Overview

Location

London, UK

Contractor

MJN Colston Limited (Croydon)

Specification

Crane FS Dominators ProBalance balancing valves
Download case study as PDF

Crane Fluid System ProBalance Dominators & Balancing Valves have been installed in the 60,335 capacity home of Arsenal Football Club, the Emirates Stadium, North London.

The heating and air-conditioning of the office building and player’s changing rooms are controlled by fan coil units, in which the Dominator is installed. Completed in August 2006, the football stadium has four tiers of seating covered by 30,000 sq. metres of roofing, which makes it the second  largest football stadium in England, second only to Manchester United’s, Old Trafford.

In 2004, Emirates Airline signed a fifteen year contract for the naming rights of the stadium, a deal worth approximately £100 million.

 

Related Projects
University of Birmingham
Education
Molecular Sciences Building, University of Birmingham

Crane Fluid Systems have supplied DPZV valves for the construction of the new Molecular Sciences building at University of Birmingham.

Read Case Study
british-museum
Arts
British Museum

Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.

Read Case Study
aldersgate-manchester
Mixed Development
Aldersgate Street, London

Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.

DownloadRead Case Study
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study