Crane Fluid System ProBalance Dominators & Balancing Valves have been installed in the 60,335 capacity home of Arsenal Football Club, the Emirates Stadium, North London.
The heating and air-conditioning of the office building and player’s changing rooms are controlled by fan coil units, in which the Dominator is installed. Completed in August 2006, the football stadium has four tiers of seating covered by 30,000 sq. metres of roofing, which makes it the second largest football stadium in England, second only to Manchester United’s, Old Trafford.
In 2004, Emirates Airline signed a fifteen year contract for the naming rights of the stadium, a deal worth approximately £100 million.
Related Projects

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.

Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.