<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
arsenal-emirates

Arsenal Emirates Stadium

Project Overview

Location

London, UK

Contractor

MJN Colston Limited (Croydon)

Specification

Crane FS Dominators ProBalance balancing valves
Download case study as PDF

Crane Fluid System ProBalance Dominators & Balancing Valves have been installed in the 60,335 capacity home of Arsenal Football Club, the Emirates Stadium, North London.

The heating and air-conditioning of the office building and player’s changing rooms are controlled by fan coil units, in which the Dominator is installed. Completed in August 2006, the football stadium has four tiers of seating covered by 30,000 sq. metres of roofing, which makes it the second  largest football stadium in England, second only to Manchester United’s, Old Trafford.

In 2004, Emirates Airline signed a fifteen year contract for the naming rights of the stadium, a deal worth approximately £100 million.

 

Related Projects
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study
spring-mews
Education
Spring Mews Student Accommodation

Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.

Read Case Study
skinners
Education
The Skinner’s Kent Academy

Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.

Read Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study
beirut
Leisure
ABC Verdun, Beirut

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

DownloadRead Case Study