Our genius is valves ®
arsenal-emirates

Arsenal Emirates Stadium

Project Overview

Location

London, UK

Contractor

MJN Colston Limited (Croydon)

Specification

Crane FS Dominators ProBalance balancing valves
Download case study as PDF

Crane Fluid System ProBalance Dominators & Balancing Valves have been installed in the 60,335 capacity home of Arsenal Football Club, the Emirates Stadium, North London.

The heating and air-conditioning of the office building and player’s changing rooms are controlled by fan coil units, in which the Dominator is installed. Completed in August 2006, the football stadium has four tiers of seating covered by 30,000 sq. metres of roofing, which makes it the second  largest football stadium in England, second only to Manchester United’s, Old Trafford.

In 2004, Emirates Airline signed a fifteen year contract for the naming rights of the stadium, a deal worth approximately £100 million.

 

Related Projects
beirut
Leisure
ABC Verdun, Beirut

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

DownloadRead Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
ritz-carlton
Leisure
The Ritz-Carlton, Jordan

A luxury hotel comprising 228 guest rooms, 34 of which are spacious suites.

DownloadRead Case Study
Lyric
Leisure
Lyric Theatre

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

Read Case Study