<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
old-bailey

7-10 Old Bailey

Project Overview

Location

London, UK

Client

MWB Group Ltd 

Architect / Consulting Engineer

Sidell Gibson Architects and Avery Associates

Contractor

Bowen

Distributor

Pipe Centre (Bermondsey) Ltd

Specification

Crane FS Commpac Manifold Systems
Download case study as PDF

CommPac manifolds from Crane Fluid Systems have been installed in the heating and cooling system of this London office building. The construction of No. 7-10 Old Bailey has been designed so that the 6700sqm of new office space can be easily divided into separate units.

Crane's CommPac manifold commissioning system provides one easy point for commissioning multiple terminal units. All site connections can be made without the need to access the internal components, a feature that dramatically reduces commissioning costs and time.

Related Projects
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study
king-hussein
Commercial
King Hussein Business Park, Amman

One of the HVAC plant rooms at the complex serving 75 international & local companies.

DownloadRead Case Study
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study