CommPac manifolds from Crane Fluid Systems have been installed in the heating and cooling system of this London office building. The construction of No. 7-10 Old Bailey has been designed so that the 6700sqm of new office space can be easily divided into separate units.
Crane's CommPac manifold commissioning system provides one easy point for commissioning multiple terminal units. All site connections can be made without the need to access the internal components, a feature that dramatically reduces commissioning costs and time.
Related Projects
The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.
Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.
Claimed to be the largest mall in the world – opening with more than 1200 stores.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.