<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
british-museum

British Museum

Project Overview

Location

London, UK

Client

Michael J Lonsdale Group

Specification

Crane FS Dominator with PICV

Crane Fluid Systems supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.

The museum received a grant of £10 million from the Heritage Lottery Fund and underwent the facilities upgrade to maintain its international reputation for excellence. The project has helped create a more efficient and environmentally sustainable museum.

The Crane FS valves were used as part of the variable air volume systems and air handling units providing heating, air conditioning and ventilation in the museum. The Pressure Independent Control Valve (PICV) is a cost efficient option as it provides accurate flow rates and differential pressure controls which operate simultaneously.

Crane has been supplying MJL Group for over 30 years.

Bill Simpson the Mechanical Site Manager at MJL Group emphasised the reason for the long standing partnership saying,

“Crane have always been there as a reputable valve manufacturer. The product is labour and time saving, and the valve set up is a first class product, which is very hard to match”.

The extension, completed in 2014, includes a state of the art conservation and exhibitions centre.

Published: 2013
Related Projects
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study
first-street
Arts
First Street Cultural Centre

Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

Read Case Study
seashell-trust
Mixed Development
Seashell Trust, Manchester

An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study