Phase 3 of Kuwait’s largest shopping destination was completed in 2012 and consists of more than 86,000 square metres of retail space. Located in the Al Rai district of Kuwait City, the mall was designed by London and Los Angeles offices of Gensler, in conjunction with Kuwait developers, Mabanee.
The completed third phase houses 545 retail units. This stage of the project was awarded to Bader Al Mulla, one of Kuwait’s top MEP contractors on a very tight time-scale. Crane Fluid Systems together with their distributor, Asia Electro-Mechanical, committed to holding valve stocks in Kuwait to service this project and ensure no delays. This was a key factor in persuading Bader Al Mulla to place the order for the complete range of valves with Asia / Crane FS.
The first phase of the project opened in April 2007 and includes the largest IKEA in the region, the first Carrefour supermarket in Kuwait and a 10 screen cinema complex. The building design is inspired by the natural forms and elements of the desert. It is also built using environmentally friendly techniques which utilise natural sunlight.
The completed mall includes more than 100 restaurants, a spa, an entertainment centre, a boutique mall, hotels, offices, a convention centre and a theatre.
Related Projects

295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

An imposing 80,000 seater stadium that will host the 2022 World Cup final.

Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.

Award-winning ‘green building’ provides training for pilots, flight attendants & staff members.

A 300-kilometre metro network with four lines and 80 stations;