The largest tertiary hospital in UAE – built as part of the Abu Dhabi Economic Vision 2030.
Specification
Crane FS balancing valves, general valves and strainers
Related Projects
An imposing 80,000 seater stadium that will host the 2022 World Cup final.
A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.
A 300-kilometre metro network with four lines and 80 stations;
Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.
The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.