Almack House, London

Almack House, London

Project Overview

Project

Almack House, London

MEP Contractor

Mectric Solutions

M&E Consultancy

A Plus Consulting

Products Used

Dominator Eco & ACTMDBUS Modbus Actuator

Crane Fluid Systems provided initial technical and product guidance to M&E consultancy A Plus Consulting, following an enquiry on a multi-floor refurbishment at Almack House, King Street, London.

The Dominator Eco was selected due to its compact size, flow control accuracy and ease of installation due to restricted ceiling voids. The valve was accompanied by the Crane ACTMDBUS Modbus actuator, allowing for remote flow setting, commissioning and diagnostic reporting, allowing for a significantly shorter commissioning period.

Crane FS worked closely with all tendering MEP contractors with Mectric Solutions being awarded the contract. Orders were placed through Wolseley and all valves and actuators were shipped within 10 working days from our manufacturing facility in Hitchin, Hertfordshire. Dominator sets and actuators were sent to Ability Projects to be pre-configured on to the Fan Coil Units (FCUs) to save time on the on-site installation.

Once installed, the actuators were integrated into the BMS system by 3mse, using a Modbus register and values bespoke for this project, allowing for a seamless integration. Commissioning of the system was completed successfully, and Crane FS have subsequently worked with the MEP contractors on the other floors (Celsius Solutions & Conditioned Environment) to deliver the same solution.

Crane Fluid System's Dominator Eco providing a compact solution for fan coil units

Crane Fluid System’s Dominator Eco providing a compact solution for fan coil units

Published: 2025
Related Projects
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
DPZVs in Thames Valley Police F Block
Public Sector
Thames Valley Police F Block Project

Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire

DownloadRead Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study