<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
first-street

First Street Cultural Centre

Project Overview

Location

Manchester, UK

Client

Manchester City Council

Contractor

Wates Construction

Distributor

Dodd Group (Telford)

Specification

Crane Fluid Systems’ PICV

Crane Fluid Systems provided PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

The £19M venue, in the city centre, houses two theatres, five cinemas, gallery and restaurant space and anchors a major regeneration scheme that transformed Manchester’s southern gateway. It also provides a new joint home for the city’s Library Theatre Company and Cornerhouse.

The build also features a 208-bed, four star hotel, 700 space multi-storey car park and 30,000 square feet of shopping, food and drink and leisure facilities. There is also a new public square which hosts outdoor performances, and two theatres seat 500 and 150 people respectively.

The scheme, designed by Beetham Tower architect Ian Simpson and Dutch firm Mecanoo, was given the go ahead by planners at Manchester town hall. The plans form part of a wider £80M investment in the First Street area which is ultimately expected to create up to 10,000 new jobs.

 

Related Projects
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study
seashell-trust
Mixed Development
Seashell Trust, Manchester

An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.

DownloadRead Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study