The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.
Specification
Crane FS HVAC valves
Related Projects
A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.
The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.
A range of Crane FS valve types were specified and installed in the Qatar stadiums
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.