<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
akh-tower

AKH Tower, Dammam

Project Overview

Location

Dammam, Saudi Arabia

Sector

Mixed Development

Client

Abdulkarim Tower

M&E Consultant

Dewan Architects

M&E Contractor

Shapoorji Pallonji, Olayan Voltas - Saudi Ensas

Distributor

ARCOM
Download case study as PDF

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

Specification

Crane FS HVAC valves

Related Projects
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
ritz-carlton
Leisure
The Ritz-Carlton, Jordan

A luxury hotel comprising 228 guest rooms, 34 of which are spacious suites.

DownloadRead Case Study
beirut
Leisure
ABC Verdun, Beirut

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

DownloadRead Case Study
Almack House, London
Commercial
Almack House, London

Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment

Read Case Study
akh-tower
Commercial
AKH Tower, Dammam

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

DownloadRead Case Study