<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
akh-tower

AKH Tower, Dammam

Project Overview

Location

Dammam, Saudi Arabia

Sector

Mixed Development

Client

Abdulkarim Tower

M&E Consultant

Dewan Architects

M&E Contractor

Shapoorji Pallonji, Olayan Voltas - Saudi Ensas

Distributor

ARCOM
Download case study as PDF

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

Specification

Crane FS HVAC valves

Related Projects
akh-tower
Commercial
AKH Tower, Dammam

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
kempinski
Hotels & Leisure
Kempenski Hotel Marsa Malaz, Doha

Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.

DownloadRead Case Study
Almack House, London
Commercial
Almack House, London

Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment

Read Case Study
Al-Salam-Hospitall
Medical
Al Salam Hospital, Al Khobar

A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.

DownloadRead Case Study