<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
akh-tower

AKH Tower, Dammam

Project Overview

Location

Dammam, Saudi Arabia

Sector

Mixed Development

Client

Abdulkarim Tower

M&E Consultant

Dewan Architects

M&E Contractor

Shapoorji Pallonji, Olayan Voltas - Saudi Ensas

Distributor

ARCOM
Download case study as PDF

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

Specification

Crane FS HVAC valves

Related Projects
middle-eastern-airline
Education
Middle Eastern Airline Training Facility, Beirut

Award-winning ‘green building’ provides training for pilots, flight attendants & staff members.

DownloadRead Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
fountain-views
Residential
Fountain Views Hotel & Residence, UAE

A high-rise complex that comprises luxury serviced apartments as well as an ‘Address’ branded hotel.

DownloadRead Case Study
riyadh-metro
Infrastructure
Riyadh Metro, Saudi Arabia

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study