Completion of the HVAC system in one of the UK’s newest hospitals, Broomfield Hospital in Chelmsford, is due for July 2010. It will be capable of carrying out up to 20,000 treatments a year. It will comprise 361 beds, 5 theatres, a 100-bed emergency assessment facility, a new A&E department, a pharmacy suite, a maternity & neonatal care unit and a rooftop helipad for the Essex Air Ambulance service.
Crane Fluid Systems valves are being installed to control flow in the heating and cooling water systems throughout the hospital. Their adaptability to modular construction and installation enables commissioning and maintenance work to be carried out with minimum disruption.
Related Projects

Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.

The facility includes 1200 student rooms and a 32 bed hotel.

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.