Completion of the HVAC system in one of the UK’s newest hospitals, Broomfield Hospital in Chelmsford, is due for July 2010. It will be capable of carrying out up to 20,000 treatments a year. It will comprise 361 beds, 5 theatres, a 100-bed emergency assessment facility, a new A&E department, a pharmacy suite, a maternity & neonatal care unit and a rooftop helipad for the Essex Air Ambulance service.
Crane Fluid Systems valves are being installed to control flow in the heating and cooling water systems throughout the hospital. Their adaptability to modular construction and installation enables commissioning and maintenance work to be carried out with minimum disruption.
Related Projects

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Crane Fluid Systems have supplied DPZV valves for the construction of the new Molecular Sciences building at University of Birmingham.

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers