<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Bosch HQ

A wide range of Crane Fluid Systems valves have been specified for phase 2 upgrades of the Worcester Bosch facility in Worcester.

M&E consultants ESDP were required to undertake the project using Revit and BIM compliant products.

Not only were Crane Fluid Systems the specified valve manufacturer for the project, their extensive range of revit models available via the Bimstore means they have secured these parts aswell as planned future phases.

The schematic below is an example of Crane FS valves being used on this project based on the specification and their use within the BIM model. A 3D model is created using BIM components and then this is converted to a 2D schematic showing the valve outlines. 

Bim schematic

Click here to find out more about Cranes Fluid Systems BIM components. 

Latest News
Mixed Metal
Silver Nitrate & Silver Peroxide in Mixed Metal Pipework

Darren Westwood, Group Quality Director of Crane Building Services & Utilities, has detailed the use of Silver Nitrate and Silver Peroxide in mixed metal pipework in heating and cooling systems.

07 Apr 2025
ISO 45001:2018
Crane BS&U Achieves ISO 45001:2018 Certification

Crane Building Services & Utilities is proud to announce that we have officially achieved the internationally recognised ISO 45001:2018 Occupational Health and Safety Management System certification. This significant milestone is a testament to our unwavering commitment to the health, safety, and well-being of our Associates. It marks the culmination of a rigorous and collaborative journey, […]

07 Apr 2025
Data Centre World
Crane Fluid Systems Exhibits at Data Centre World 2025

The Crane team showcased our industry-leading valve solutions for data centre cooling systems.

14 Mar 2025