The Downtown Line Stage 3 (DTL3) is a 21km, underground, automatic, driverless metro in Singapore. Initiated by the Land Transport Authority (LTA), DTL3 aims to improve rail connectivity between the eastern corridors and the central business district (CBD) while developing the urban Marina Bay area.
Project was supplied with Crane DRV balancing valves installed at the chillers, cooling towers, AHU and FCU.
Related Projects
An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.
A 300-kilometre metro network with four lines and 80 stations;
Crane Fluid Systems Balancing Valves were selected for West Kowloon Station, a landmark building on Hong Kong’s famous skyline.
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.
This HSBC Data Centre is the first standalone data centre in Hong Kong meeting the design requirements of Tier IV standard.