Our genius is valves ®
Downtown-Line-Stage-3

Downtown Line Stage 3, Singapore

Project Overview

Location

Singapore

Sector

Infrastructure

Client

Singapore Land Transport Authority

Consultant

Parsons Brinkerhoff (now WSP)

Distributor

Swee Hup Engineering Resources Pte Ltd

M&E Contractor

Samsung-Bintai Kindenko JV

Specification

Crane FS DRV Balancing Valves
Download case study as PDF

The Downtown Line Stage 3 (DTL3) is a 21km, underground, automatic, driverless metro in Singapore. Initiated by the Land Transport Authority (LTA), DTL3 aims to improve rail connectivity between the eastern corridors and the central business district (CBD) while developing the urban Marina Bay area.

Project was supplied with Crane DRV balancing valves installed at the chillers, cooling towers, AHU and FCU.

Published: 2022
Related Projects
Qatar-Rail
Infrastructure
Qatar National Rail Scheme

A 300-kilometre metro network with four lines and 80 stations;

DownloadRead Case Study
Kowloon Railway Case Study
Infrastructure
West Kowloon Railway Station, Hong Kong

Balancing Valves for Landmark Hong Kong Building Crane Fluid Systems balancing valves were selected for West Kowloon Station, a landmark building on Hong Kong’s famous skyline. The station serves as Hong Kong’s gateway to Guangzhou Province and the Mainland and one of the world’s largest underground cross-border railway stations.

DownloadRead Case Study
Downtown-Line-Stage-3
Infrastructure
Downtown Line Stage 3, Singapore

Balancing valves for a 21km, underground, automatic, driverless metro in Singapore