Crane Fluid Systems has supplied Dominators and a selection of general valves for the new extension at the Tate Modern, The Tate Project, situated on the banks of the River Thames, South-East London.
Tate Modern was designed for an annual audience of two million visitors, but receives around five million, putting pressure on existing facilities. The expansion will create a less congested, more welcoming environment, at the same time doubling exhibition and display space and enabling the gallery to show more of their Collection. There will also be more cafés, terraces and concourses in which to meet and unwind.
The new development will continue to bolster the growth of the borough. A public walkway through the building will make possible a direct route from the City to the heart of Southwark and there will be two new public squares to the south and west of the building. To the east, a new planted area will be created especially for the use of the local community and staff.
Related Projects
Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.
Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.