<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
king-hussein

King Hussein Business Park, Amman

Project Overview

Location

Amman, Jordan

Sector

Commercial

Client

KHBO King Hussein Business Park Holding company

M&E Consultant

Dar AlHandasa

M&E Contractor

Aysel construction

Distributor

Seasons
Download case study as PDF

One of the HVAC plant rooms at the complex serving 75 international & local companies.

Specification

Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves.

 

Related Projects
Al-Salam-Hospitall
Medical
Al Salam Hospital, Al Khobar

A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.

DownloadRead Case Study
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
dr-sulaiman
Medical
Dr. Sulaiman Al-Habib Hospital, Al Khobar

Offering a cutting edge virtual healthcare system – ‘Cyber Care’ will provide diagnostic & therapeutic services.

DownloadRead Case Study
beirut
Leisure
ABC Verdun, Beirut

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

DownloadRead Case Study