<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Manchester-Airport

Manchester Airport

Project Overview

Location

Manchester, United Kingdom

Sector

Infrastructure

M&E Contractor

Rotary North West
Download case study as PDF

The heating and air-conditioning systems within the Ground Transport Interchange at Manchester Airport are controlled by the latest fan coil management system from Crane Fluid Systems.

Specification

Z3000 Dominator valves

Manchester AIrport
Related Projects
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study
riyadh-metro
Infrastructure
Riyadh Metro, Saudi Arabia

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

DownloadRead Case Study