Broomfield

Project Overview

Project

Broomfield Hospital, Chelmsford

Client

Mid Essex Hospital NHS Trust

Architect/Consulting Engineer

NPS Property Consultants

Contractor

Shepherd Engineering Services

Distributor

BSS (Romford) Ltd

Specification

Crane Fluid Systems - ball valves, butterfly valves, strainers, check valves and regulating and commissioning valves.
Download case study as PDF

Completion of the HVAC system in one of the UK’s newest hospitals, Broomfield Hospital in Chelmsford, is due for July 2010. It will be capable of carrying out up to 20,000 treatments a year. It will comprise 361 beds, 5 theatres, a 100-bed emergency assessment facility, a new A&E department, a pharmacy suite, a maternity & neonatal care unit and a rooftop helipad for the Essex Air Ambulance service.

Crane Fluid Systems valves are being installed to control flow in the heating and cooling water systems throughout the hospital. Their adaptability to modular construction and installation enables commissioning and maintenance work to be carried out with minimum disruption.

Published: 2010
Related Projects
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
Lyric
Leisure
Lyric Theatre

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

Read Case Study
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study