Completion of the HVAC system in one of the UK’s newest hospitals, Broomfield Hospital in Chelmsford, is due for July 2010. It will be capable of carrying out up to 20,000 treatments a year. It will comprise 361 beds, 5 theatres, a 100-bed emergency assessment facility, a new A&E department, a pharmacy suite, a maternity & neonatal care unit and a rooftop helipad for the Essex Air Ambulance service.
Crane Fluid Systems valves are being installed to control flow in the heating and cooling water systems throughout the hospital. Their adaptability to modular construction and installation enables commissioning and maintenance work to be carried out with minimum disruption.
Related Projects
Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.
Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire
Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.