Project Overview

Project

Broomfield Hospital, Chelmsford

Client

Mid Essex Hospital NHS Trust

Architect/Consulting Engineer

NPS Property Consultants

Contractor

Shepherd Engineering Services

Distributor

BSS (Romford) Ltd

Specification

Crane Fluid Systems - ball valves, butterfly valves, strainers, check valves and regulating and commissioning valves.
Download case study as PDF

Completion of the HVAC system in one of the UK’s newest hospitals, Broomfield Hospital in Chelmsford, is due for July 2010. It will be capable of carrying out up to 20,000 treatments a year. It will comprise 361 beds, 5 theatres, a 100-bed emergency assessment facility, a new A&E department, a pharmacy suite, a maternity & neonatal care unit and a rooftop helipad for the Essex Air Ambulance service.

Crane Fluid Systems valves are being installed to control flow in the heating and cooling water systems throughout the hospital. Their adaptability to modular construction and installation enables commissioning and maintenance work to be carried out with minimum disruption.

Published: 2010
Related Projects
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
100-bishopgate
Commercial
100 Bishopsgate

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

DownloadRead Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study