Completion of the HVAC system in one of the UK’s newest hospitals, Broomfield Hospital in Chelmsford, is due for July 2010. It will be capable of carrying out up to 20,000 treatments a year. It will comprise 361 beds, 5 theatres, a 100-bed emergency assessment facility, a new A&E department, a pharmacy suite, a maternity & neonatal care unit and a rooftop helipad for the Essex Air Ambulance service.
Crane Fluid Systems valves are being installed to control flow in the heating and cooling water systems throughout the hospital. Their adaptability to modular construction and installation enables commissioning and maintenance work to be carried out with minimum disruption.
Related Projects
Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire