<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Manchester-Airport

Manchester Airport

Project Overview

Location

Manchester, United Kingdom

Sector

Infrastructure

M&E Contractor

Rotary North West
Download case study as PDF

The heating and air-conditioning systems within the Ground Transport Interchange at Manchester Airport are controlled by the latest fan coil management system from Crane Fluid Systems.

Specification

Z3000 Dominator valves

Manchester AIrport
Related Projects
Downtown-Line-Stage-3
Infrastructure
Downtown Line Stage 3, Singapore

Balancing valves for a 21km, underground, automatic, driverless metro in Singapore

DownloadRead Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
Kowloon Railway Case Study
Infrastructure
West Kowloon Railway Station, Hong Kong

Crane Fluid Systems Balancing Valves were selected for West Kowloon Station, a landmark building on Hong Kong’s famous skyline.

DownloadRead Case Study
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study