The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.
Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.
Related Projects
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.