<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
9-elms

Nine Elms, London

Project Overview

Location

New Covent Garden Market, London, UK

Sector

Mixed Development

Client

St Modwen

Channel Partner

BSS
Download case study as PDF

The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.

Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.

Published: 2020
Related Projects
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
serafi-mall
Mixed Development
Serafi Mall, Jeddah

A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.

DownloadRead Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study
Almack House, London
Commercial
Almack House, London

Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment

Read Case Study