The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.
Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.
Related Projects
Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.