The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.
Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.
Related Projects
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.