<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
trinity-gardens-newcastle

Trinity Gardens, Newcastle Upon Tyne

Project Overview

Location

Newcastle-Upon-Tyne, United Kingdom

Sector

Mixed Development

M&E Contractor

Norstead
Download case study as PDF

Dominator Z3000 flow management combination valve units from Crane Fluid Systems were installed in a 60,000 sq ft office development, the centerpiece building within a£55m mixed development known as Trinity Gardens in Newcastle-Upon-Tyne.

Specification

Crane FS Dominator valves.

Related Projects
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
Lyric
Leisure
Lyric Theatre

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

Read Case Study