Dominator Z3000 flow management combination valve units from Crane Fluid Systems were installed in a 60,000 sq ft office development, the centerpiece building within a£55m mixed development known as Trinity Gardens in Newcastle-Upon-Tyne.
Specification
Crane FS Dominator valves.
Related Projects
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
The facility includes 1200 student rooms and a 32 bed hotel.