<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
beirut

Clemenceau Medical Center CMC, Beirut

Project Overview

Location

Beirut, Lebanon 

Sector

Medical

Consultant

Khatib & Alami

Mep Contractor

ME Group (MEG)

Channel Partner

MK Mustafa Ahmed Knio
Download case study as PDF

The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.

Specification

Malleable iron pipe fittings, balancing valves plus a wide selection of general valves & strainers.

Related Projects
kempinski
Hotels & Leisure
Kempenski Hotel Marsa Malaz, Doha

Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.

DownloadRead Case Study
Lusail Stadium
Leisure
World Cup Stadia

A range of Crane FS valve types were specified and installed in the Qatar stadiums

DownloadRead Case Study
king-hussein
Commercial
King Hussein Business Park, Amman

One of the HVAC plant rooms at the complex serving 75 international & local companies.

DownloadRead Case Study
headquarters-cs
Commercial
Headquarters Business Park, Jeddah

Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.

DownloadRead Case Study
Qatar-Rail
Infrastructure
Qatar National Rail Scheme

A 300-kilometre metro network with four lines and 80 stations;

DownloadRead Case Study