The Nine Elms N8 Tower development comprises of one, two & three-bedroom flats and penthouses, plus commercial & retail space on the lower levels.
Crane Fluid Systems Dominator Peak Pro with PICV, BSRIA Flushing Drain & FMD along with a range of general valves were chosen for this modern mixed-use project.
Related Projects
Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.
Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.
Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.