<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Crossrail

Crossrail Shopping Centre

Project Overview

Project

Crossrail Shopping Centre

Client

Canary Wharf Contractors LTD (CWC)

Contractor

Balfour Beatty

Distributor

Pipe Centre Slough

Specification

Crane FS Butterfly Valves, Cast Iron Double Regulating Valves (DRVs), Check Valves and Strainers

Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer and Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre, located above the new Crossrail station at Canary Wharf, London. 

The Canary Wharf Crossrail station will be one of the largest at six storeys high and forms part of a plan to revitalise Britain’s aged railway network and relieve overcrowding on the main lines. 

Crossrail, set to open in 2018, is currently the biggest infrastructure project in Europe. The route stretches 118km, from Maidenhead and Heathrow in the west, underneath central London in 21km-long twin-bore tunnels via Paddington, the West End, Liverpool Street and Canary Wharf, to Shenfield and Abbey Wood in the east. 

The Crane FS valves will be installed within the HVAC system in the retail centre, which will occupy four of the six storeys along with a landscaped park, restaurant and community facility on the top floor. The station will be covered by an elegant, semi open-air timber lattice roof, allowing views out over the dock of Canary Wharf and beyond. 

The Canary Wharf station has been designed and constructed on behalf of Crossrail by Canary Wharf Contractors Limited, a wholly owned subsidiary of Canary Wharf Group plc. It is being built for a fixed price of £500m. 

Published: 2018
Related Projects
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
british-museum
Arts
British Museum

Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.

Read Case Study
spring-mews
Education
Spring Mews Student Accommodation

Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.

Read Case Study