<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
tower-wharf-bristol

Tower Wharf, Bristol

Project Overview

Location

Bristol, United Kingdom

Sector

Mixed Development

M&E Contractor

Haden Young
Download case study as PDF

Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.

Specification

Crane FS isolation and balancing valves.

 

Related Projects
st-barts-london
Medical
St Barts Hospital, London

Supplying 300 Peak Pro Dominators to London’s oldest hospital

DownloadRead Case Study
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
serafi-mall
Mixed Development
Serafi Mall, Jeddah

A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.

DownloadRead Case Study
Sheldon Square
Commercial
Sheldon Square, London

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Read Case Study