<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
tower-wharf-bristol

Tower Wharf, Bristol

Project Overview

Location

Bristol, United Kingdom

Sector

Mixed Development

M&E Contractor

Haden Young
Download case study as PDF

Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.

Specification

Crane FS isolation and balancing valves.

 

Related Projects
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
picadilly-gate
Public Sector
Piccadilly Gate

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

Read Case Study
spring-mews
Education
Spring Mews Student Accommodation

Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.

Read Case Study
Crossrail
Retail
Crossrail Shopping Centre

Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.

Read Case Study
University of Birmingham
Education
Molecular Sciences Building, University of Birmingham

Crane Fluid Systems have supplied DPZV valves for the construction of the new Molecular Sciences building at University of Birmingham.

Read Case Study