Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.
Specification
Crane FS isolation and balancing valves.
Related Projects

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.