Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.
Specification
Crane FS isolation and balancing valves.
Related Projects

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.


Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.