<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
piccadilly-gate-manchester

Piccadilly Gate, Manchester

Project Overview

Location

Manchester, United Kingdom

Sector

Mixed development

M&E Contractor

SES
Download case study as PDF

More than 800 Dominators from Crane Fluid Systems were installed in the heating and cooling system of a large new office development in Manchester’s Piccadilly Square.

Specification

Crane FS Dominator valves

Related Projects
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study