<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
DSC01481s

Chaplin House

Project Overview

Location

London, UK

Contractor

Delta T Services

Specification

Dominator Peak Pro 

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

The self-contained office building has undergone comprehensive refurbishments to a Grade A office specification.

Lightweight and modular, the Dominator Peak valve system includes the Peak Pro Pressure Independent Control Valve for accurate flow, temperature and pressure control. The compact units have an integral Venturi metering station for an improved flow range, a small footprint with equal length pipework and the ability to orientate the valve on-site for an easier and faster installation on any fan coil or chilled beam.

The system is able to achieve excellent valve authority at all settings by utilising the Crane FS gap detection actuator. This allows for maximum efficiency gains against required pump settings to achieve the required flow rates.

The Dominator Peak Pro has been designed to deliver and maintain a system that enables energy and cost reduction over its lifetime. Prior to production, the valve has undergone significant design validation testing in accordance with BSRIA BTS01, subjected to 10,000 cycles, which is equivalent to 15 years of typical service, and the performance has remained excellent. In addition, every Peak Pro PICV is tested to in accordance with BSRIA BTS-01, more specifically a Flow Limitation test (FLT).

DSC01770s
Related Projects
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
first-street
Arts
First Street Cultural Centre

Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

Read Case Study
akh-tower
Commercial
AKH Tower, Dammam

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

DownloadRead Case Study