The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.
Specification
Crane FS balancing valves, general valves and strainers.
Related Projects
Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.
Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.
A high-rise complex that comprises luxury serviced apartments as well as an ‘Address’ branded hotel.
Crane FS has supplied a range of general valves to the Mall of Egypt, a five star complex which will include a ski dome.
An imposing 80,000 seater stadium that will host the 2022 World Cup final.