<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
one-blackfriars

One Blackfriars Tower, London

Project Overview

Location

London, United Kindom

Sector

Mixed Development

Client

St George

M&E Consultant

Hoare Lea

M&E Contractor

Designer Group UK

Distributor

BSS
Download case study as PDF

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

Specification

Crane FS Balancing valves including DPCV, general and public health valves

Related Projects
skinners
Education
The Skinner’s Kent Academy

Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.

Read Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
Almack House, London
Commercial
Almack House, London

Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment

Read Case Study