Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
Specification
Crane FS Balancing valves including DPCV, general and public health valves
Related Projects
Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.
The facility includes 1200 student rooms and a 32 bed hotel.
Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
Crane Fluid Systems have supplied DPZV valves for the construction of the new Molecular Sciences building at University of Birmingham.