Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
Specification
Crane FS Balancing valves including DPCV, general and public health valves
Related Projects
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.