<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
one-blackfriars

One Blackfriars Tower, London

Project Overview

Location

London, United Kindom

Sector

Mixed Development

Client

St George

M&E Consultant

Hoare Lea

M&E Contractor

Designer Group UK

Distributor

BSS
Download case study as PDF

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

Specification

Crane FS Balancing valves including DPCV, general and public health valves

Related Projects
picadilly-gate
Public Sector
Piccadilly Gate

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

Read Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study
seashell-trust
Mixed Development
Seashell Trust, Manchester

An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.

DownloadRead Case Study
one-blackfriars
Mixed Development
One Blackfriars Tower, London

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

DownloadRead Case Study