More than 800 Dominators from Crane Fluid Systems were installed in the heating and cooling system of a large new office development in Manchester’s Piccadilly Square.
Specification
Crane FS Dominator valves
Related Projects
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.
The facility includes 1200 student rooms and a 32 bed hotel.