More than 800 Dominators from Crane Fluid Systems were installed in the heating and cooling system of a large new office development in Manchester’s Piccadilly Square.
Specification
Crane FS Dominator valves
Related Projects

100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.

Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.