<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
riyadh-metro

Riyadh Metro, Saudi Arabia

Project Overview

Location

Riyadh, Saudi Arabi

Sector

Infrastructure

Client

Royal Commission for the Riyadh City (RCRC)

M&E Consultants

Three consortiums, BACS (Bechtel,AlMabani,CCC, Siemens), FAST (FCC, ALSTOM, SAMSUNG, Tecnica Y Proyectos) ANM (AlRiyadh New Mobility)

M&E Contractors

Jones Engineering, STL, AlZamil, NESMA

Distributor

ARCOM
Download case study as PDF

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

Specification

Crane FS general valves including gate, butterfly and resilent seated gate valves.

 

Related Projects
Kowloon Railway Case Study
Infrastructure
West Kowloon Railway Station, Hong Kong

Crane Fluid Systems Balancing Valves were selected for West Kowloon Station, a landmark building on Hong Kong’s famous skyline.

DownloadRead Case Study
beirut
Leisure
ABC Verdun, Beirut

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

DownloadRead Case Study
dubai-mall
Commercial
The Dubai Mall, UAE

Claimed to be the largest mall in the world – opening with more than 1200 stores.

DownloadRead Case Study
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
egypt-skyline
Retail
Mall of Egypt

Crane FS has supplied a range of general valves to the Mall of Egypt, a five star complex which will include a ski dome.

Read Case Study