<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Steigenberger Hotel Cairo

Steigenberger Hotel, Cairo

Project Overview

Location

Cairo, Egypt

Client

Steigenberger Hotels

Consultant

EHAF

Contractor

Siemens

Channel Partner

OMEGA Engineering

Specification

Crane FS Balancing Valves and a wide selection of General Valves and Strainers
Download case study as PDF

The new Steigenberger Hotel El Tahrir is located in the heart of Cairo down town, within a short walking distance of the Egyptian Museum, Khan El Khalili and the Arab League.

The hotel offers 295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

Published: 2019
Related Projects
egypt-skyline
Retail
Mall of Egypt

Crane FS has supplied a range of general valves to the Mall of Egypt, a five star complex which will include a ski dome.

Read Case Study
middle-eastern-airline
Education
Middle Eastern Airline Training Facility, Beirut

Award-winning ‘green building’ provides training for pilots, flight attendants & staff members.

DownloadRead Case Study
dr-sulaiman
Medical
Dr. Sulaiman Al-Habib Hospital, Al Khobar

Offering a cutting edge virtual healthcare system – ‘Cyber Care’ will provide diagnostic & therapeutic services.

DownloadRead Case Study
Al-Salam-Hospitall
Medical
Al Salam Hospital, Al Khobar

A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.

DownloadRead Case Study
headquarters-cs
Commercial
Headquarters Business Park, Jeddah

Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.

DownloadRead Case Study