<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
Steigenberger Hotel Cairo

Steigenberger Hotel, Cairo

Project Overview

Location

Cairo, Egypt

Client

Steigenberger Hotels

Consultant

EHAF

Contractor

Siemens

Channel Partner

OMEGA Engineering

Specification

Crane FS Balancing Valves and a wide selection of General Valves and Strainers
Download case study as PDF

The new Steigenberger Hotel El Tahrir is located in the heart of Cairo down town, within a short walking distance of the Egyptian Museum, Khan El Khalili and the Arab League.

The hotel offers 295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

Published: 2019
Related Projects
Al-Salam-Hospitall
Medical
Al Salam Hospital, Al Khobar

A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.

DownloadRead Case Study
Sidra-Hospital
Medical
Sidra Hospital, Doha

A range of valves for a cutting edge hospital in Qatar

DownloadRead Case Study
king-hussein
Commercial
King Hussein Business Park, Amman

One of the HVAC plant rooms at the complex serving 75 international & local companies.

DownloadRead Case Study
cleveland-clinic
Medical
Cleveland Clinic, Abu Dhabi

The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.

DownloadRead Case Study
egypt-skyline
Retail
Mall of Egypt

Crane FS has supplied a range of general valves to the Mall of Egypt, a five star complex which will include a ski dome.

Read Case Study