Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.
Specification
Crane FS isolation and balancing valves.
Related Projects
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.