Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.
Specification
Crane FS isolation and balancing valves.
Related Projects
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
Crane Fluid Systems have supplied DPZV valves for the construction of the new Molecular Sciences building at University of Birmingham.
Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
Various Crane Fluid Systems commissioning valves were used in the build of Ocean Towers, Shanghai.