<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
tower-wharf-bristol

Tower Wharf, Bristol

Project Overview

Location

Bristol, United Kingdom

Sector

Mixed Development

M&E Contractor

Haden Young
Download case study as PDF

Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.

Specification

Crane FS isolation and balancing valves.

 

Related Projects
DSC01481s
Commercial
Chaplin House

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.

Read Case Study
british-museum
Arts
British Museum

Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.

Read Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
skinners
Education
The Skinner’s Kent Academy

Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.

Read Case Study
Lyric
Leisure
Lyric Theatre

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

Read Case Study