Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.
Specification
Crane FS isolation and balancing valves.
Related Projects
Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.