<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
tower-wharf-bristol

Tower Wharf, Bristol

Project Overview

Location

Bristol, United Kingdom

Sector

Mixed Development

M&E Contractor

Haden Young
Download case study as PDF

Crane Fluid Systems supplied a full range of control valves for management of the heating and air-conditioning systems for the six story office development, Tower Wharf in Bristol’s floating harbour district.

Specification

Crane FS isolation and balancing valves.

 

Related Projects
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
picadilly-gate
Public Sector
Piccadilly Gate

Comprising 10 floors & 13,000 sq m of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers

Read Case Study
seashell-trust
Mixed Development
Seashell Trust, Manchester

An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.

DownloadRead Case Study
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
uni-northampton
Education
University of Northampton Waterside Campus

The facility includes 1200 student rooms and a 32 bed hotel.

DownloadRead Case Study