A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.
Specification
Crane FS Peak Pro Dominators.
Related Projects
Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
The facility includes 1200 student rooms and a 32 bed hotel.
Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.