The 11,000sq m Brierley Hill Medical Centre provides 21st Century healthcare facilities for Dudley Primary Care Trust. Installed with a low energy M&E package, half of the building will be naturally ventilated and the other half will rely on traditional HVAC systems.
Over 1,200 Crane ProBalance valves control the heating and chilled water flow through fan coil units within the 5 storey building. Crane’s ProBalance bronze balancing valves use fixed orifice technology to ensure fast commissioning and enhanced regulating performance. The compact design means they take up less space and the integral orifice reduces the need for on-site jointing, resulting in reduced installation costs for the contractor.
Related Projects
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.
Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.
Crane Fluid Systems supported the extensive redevelopment of a 1980’s office block to provide high quality office space for the City market.
An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.