The 11,000sq m Brierley Hill Medical Centre provides 21st Century healthcare facilities for Dudley Primary Care Trust. Installed with a low energy M&E package, half of the building will be naturally ventilated and the other half will rely on traditional HVAC systems.
Over 1,200 Crane ProBalance valves control the heating and chilled water flow through fan coil units within the 5 storey building. Crane’s ProBalance bronze balancing valves use fixed orifice technology to ensure fast commissioning and enhanced regulating performance. The compact design means they take up less space and the integral orifice reduces the need for on-site jointing, resulting in reduced installation costs for the contractor.
Related Projects
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.