Dominators from Crane Fluid Systems have been installed in the HVAC system for Holiday Inn hotel which forms part of MediaCityUK in Manchester. The glass-fronted, 16 floor hotel boasts 218 ensuite bedrooms, a restaurant, bar and conferencing facilities, all of which are serviced by a state-of-the-art air conditioning system incorporating Dominator flow management modules. In 2012, the Holiday Inn was awarded gold in the Green Tourism Business Scheme.
As part of the 1st phase of Media City UK’s construction, the Holiday Inn sits in the Studio block overlooking the Manchester Ship Canal. Phase 1, which involved regenerating 36 acres of former docklands into a home for UK’s digital and creative multi-media industry, was completed in 2011 and is now home to the BBC North, the University of Salford and Satellite Information Services.
Related Projects
100 Bishopsgate is a forty storey tower is located in the heart of the city of London and is a mixed-use commercial development.
Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.
An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.