Dominators from Crane Fluid Systems have been installed in the HVAC system for Holiday Inn hotel which forms part of MediaCityUK in Manchester. The glass-fronted, 16 floor hotel boasts 218 ensuite bedrooms, a restaurant, bar and conferencing facilities, all of which are serviced by a state-of-the-art air conditioning system incorporating Dominator flow management modules. In 2012, the Holiday Inn was awarded gold in the Green Tourism Business Scheme.
As part of the 1st phase of Media City UK’s construction, the Holiday Inn sits in the Studio block overlooking the Manchester Ship Canal. Phase 1, which involved regenerating 36 acres of former docklands into a home for UK’s digital and creative multi-media industry, was completed in 2011 and is now home to the BBC North, the University of Salford and Satellite Information Services.
Related Projects
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.
Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.
Over 800 Crane Fluid Systems Dominator Eco units have been selected and installed by MEP contractor MSL in the HVAC system of 3 Sheldon Square, Paddington, London.
Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.